![]() Capline will originate in Patoka, Illinois and will terminate in St James, Louisana. It is a 40” crude oil pipeline that spans 632 miles in length. From SS332 production can access 2 export pipelines – Cameron Highway (CHOPS) and Poseidon pipelines which access the Texas and Louisiana markets. The 115 mile pipeline, operated by Shell Pipeline Company LP, provides gathering services in Southern Green Canyon, with access to Atwater Valley, Walker Ridge, and Lund areas in the Gulf of Mexico. ![]() The capacity of Mokena to Lemont lateral is 100 kbpd.Ĭaesar Pipeline is part of the Mardi Gras Transportation System. The mainline capacity is 360 kbpd on a design crude basis with active stations. In addition, Chicap has the ability to transfer oil from Woodpat to Marathon Pipelines at Patoka. Chicap Pipeline delivers at Manhattan, Mokena, Lemont and Blue Island. The Chicap Pipeline System, operated by bp pipelines (North America), is comprised of 203 miles of 26" mainline from Patoka, IL to Manhattan/Mokena, IL, 12 miles of active 16" from Mokena, IL to Lemont, IL and 15 miles of active 14" from Mokena, IL to Blue Island, IL.Ĭhicap Pipeline receives low sulfur and heavy crude oil from Capline Pipeline, and Woodpat Pipeline and ExxonMobil at Patoka and Enbridge Pipeline at Mokena. ![]() Bp operated pipelines bp Operated and non–operated joint venture pipelines Chicap Pipeline System ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |